by Rebecca Diverty | Jun 29, 2021
Phoenix Metro ADMS Project Update WOODPATEL identified and characterized existing drainage, flooding sources, and flooding hazards within the Metro Phoenix study area. The scope includes three primary work efforts: data collection, development of a comprehensive,...
by Rebecca Diverty | Jun 29, 2021
Sweetwater Avenue Storm Drain Pre-Design Study & Final Design Through our concurrent value engineering process, WOODPATEL identified that the recommended system includes storm drains in both Sweetwater and 83rd Avenues at the budgeted project construction cost while...
by Rebecca Diverty | Jun 29, 2021
North Santa Cruz Wash Regional Flood Control The Regional Flood Control project is a partnership with the City of Maricopa, Pinal County Flood Control District, Maricopa Flood Control District, GRIC, ACIC, and adjacent landowners. The project’s primary goal is to...
by Rebecca Diverty | Jun 29, 2021
detail-link Bullard Wash Channel Improvement In addition to providing flood control, this reach of Bullard Wash Channel is designed to function as a recreational amenity and creates a sense of identity for the surrounding community. WOODPATEL prepared the final...
by Rebecca Diverty | Jun 29, 2021
Loop 303 Outfall Channel WOODPATEL prepared the design of this downstream-most portion of the regional drainage system for the Loop 303 freeway corridor. The project is funded by the District and designed in coordination with ADOT, MCDOT, and Goodyear. The upstream...
Recent Comments