Paradise Ridge

Paradise Ridge

Paradise Ridge The Flood Control District of Maricopa County identifies the Paradise Ridge Channel in the Pinnacle Peak West Area Drainage Master Study as being a necessary component to control the alluvial fan flood hazard in northeast Phoenix. When constructed, the...
Elliot Basins, Storm Drain and Outfall Channel

Elliot Basins, Storm Drain and Outfall Channel

Elliot Basins, Storm Drain and Outfall Channel The FCDMC, in association with the City of Mesa, implemented a part of the East Maricopa Area Drainage Master Plan called Elliot Detention Basin. WOODPATEL prepared design plans and specifications for this facility, which...
Phoenix Metro ADMS Project Update

Phoenix Metro ADMS Project Update

Phoenix Metro ADMS Project Update WOODPATEL identified and characterized existing drainage, flooding sources, and flooding hazards within the Metro Phoenix study area. The scope includes three primary work efforts: data collection, development of a comprehensive,...
Powerline Channel

Powerline Channel

Powerline Channel WOODPATEL designed the Powerline Channel to replace the existing FRS, which a documented earth fissure has compromised. The project develops three miles of the flood control channel, including a box culvert with utility relocations at Baseline...
Pinnacle Peak Road Basin & Channel

Pinnacle Peak Road Basin & Channel

Pinnacle Peak Road Basin & Channel WOODPATEL was the prime consultant for this FCDMC and City of Peoria project. The project included a pre-design study, final drainage, and roadway design, supporting drainage studies and reports, and post-design services. A value...