| Spook Hill ADMP |
FCDMC/Mesa |
75 |
38 |
37 |
| Agua Fria Freeway Off-Site Channel & Basin System |
ADOT/FCDMC |
32 |
18 |
14 |
| Hummingbird Spring Road Bridge over Hassayampa River |
El Dorado/Buckeye |
32.5 |
18.5 |
14 |
| Northern/Orangewood Storm Drain/Basin Project |
FCDMC/Glendale & Peoria |
27 |
16 |
11 |
| Bell Road Bridge Over Hassayampa River |
El Dorado/Buckeye |
21 |
12 |
9 |
| Greenway Road Bridge Over Hassayampa River |
El Dorado/Buckeye |
11 |
7 |
4 |
| Greenway Parkway Channel Upgrade |
Phoenix |
6.7 |
4.2 |
3.3 |
| Hermosa Vista Basin & Drains |
FCDMC/Mesa |
8.3 |
5.2 |
3.1 |
| Peoria Road Bridge Over Hassayampa River |
El Dorado/Buckeye |
9 |
6 |
3 |
| Desert Amethyst Basin & Storm Drain |
FCDMC/Peoria |
7.5 |
5 |
2.5 |
| Elliott Basins & Storm Drain |
FCDMC/Mesa |
7 |
5 |
2 |
| Sweetwater Avenue Storm Drain |
Peoria |
3.3 |
1.9 |
1.4 |
| Pinnacle Peak Road & Storm Drain |
FCDMC/Peoria |
4.3 |
3.3 |
1 |