Phoenix Zoo
When the Phoenix Zoo decided to relocate its administrative offices from Tempe to the Phoenix Zoo Campus, they selected WOODPATEL to provide survey, civil engineering, and construction inspection services. This unique project consisted of three separate structures linked through a series of roof and wall elements. Challenges to this development included maintaining positive drainage and ADA accessibility over a very steep site. The design team overcame these challenges by utilizing the existing grade where possible for drainage while using ramps and retaining walls where necessary.
WOODPATEL has since completed many fascinating exhibits and much-needed utility improvement projects at the Phoenix Zoo. We have been involved in the design processes from preliminary design through final approval. The unique nature of each exhibit required close collaboration with the out-of-state design team, contractor, Phoenix Zoo, and City of Phoenix personnel to achieve the vision of improving people’s lives through interaction with nature and excelling in conservation, education, exhibition, and recreation.
WOODPATEL has since completed many fascinating exhibits and much-needed utility improvement projects at the Phoenix Zoo. We have been involved in the design processes from preliminary design through final approval. The unique nature of each exhibit required close collaboration with the out-of-state design team, contractor, Phoenix Zoo, and City of Phoenix personnel to achieve the vision of improving people’s lives through interaction with nature and excelling in conservation, education, exhibition, and recreation.
Location
Phoenix, AZOwner
Arizona Center For Nature ConservationProject Highlights
Phoenix Zoo Entry OasisPhoenix Zoo Gift Shop
Phoenix Zoo Wild Big Cats of Arizona Exhibit
Phoenix Zoo Sumatra Tiger Exhibit
Phoenix Zoo Orangutan Exhibit
Phoenix Zoo Komodo Dragon Exhibit
Phoenix Zoo Aldabra Exhibit
Phoenix Zoo Galapagos Exhibit
Phoenix Zoo Sand Cat Exhibit
Phoenix Zoo Lake Overlook Education / Overlook Education Building (Neeley Center)
Phoenix Zoo Zebra Barn
Phoenix Zoo Conservation Building / Arthur L. and Elaine V. Johnson Foundation Conservation Center
Phoenix Zoo Savanna Grill
Phoenix Zoo Elephant Habitat Expansion
Phoenix Zoo Wildlife Amphitheatre
Phoenix Zoo Bakery Building
Phoenix Zoo Animal Hospital
Phoenix Zoo Administration Building
Phoenix Zoo Water System Upgrade / Water System Upgrades
Phoenix Zoo Fire & Water Line / Fire and Water Infrastructure
Phoenix Zoo African Trail Water & Sewer Extensions
Phoenix Zoo 1,300 Square Foot Expansion