ASU Sun Devil Fitness Center Underground Retention
The proposed project included a drainage study to investigate existing drainage conditions on a portion of the ASU Tempe Campus. The project subsequently included installing an underground regional campus stormwater retention system consisting of approximately 2,100 linear feet of 10-foot diameter Corrugated Metal Pipe. In addition, the existing student recreation center fields were re-sodded, and a portion of the existing sand volleyball courts and irrigation system was removed and replaced.
Location
Tempe, AZOwner
Arizona State UniversityProject Highlights
2,100 Linear Feet of 10-Foot Diameter Corrugated Metal PipeUnderground Regional Campus Storm Water Retention System