Skysong

The SkySong development encompasses 42Acres of land in the heart of the city- 1.2 million square-feet of research and general office space, 600 residential units, 95,000 square-feet of office space for the City of Scottsdale, and a 200-unit hotel. WOODPATEL was the lead civil engineer and provided civil engineering design services for infrastructure, mass grading earthwork plans, grading and drainage plans, roadway plans, storm drain plans, and water and sewer plans for the various projects. The initial campus development included Buildings 1 and 2, which are two 143,000 square- foot buildings and a 600-space parking garage. Phase II included student housing, consisting of 325 units in four story row-type apartment layout along with one multi-story parking garage. WOODPATEL also provided services for Building 3, which is a 100,000 square-foot building on an 8.5-acre site and a parking lot with 496 spaces. In addition, there has been extensive utility coordination with approximately 4,400 feet of storm drain, 4,900 feet of sanitary sewer lines, and 7,500 feet of domestic water lines.