The FCDMC, in association with the City of Mesa implemented a part of the East Maricopa Area Drainage Master Plan called Elliot Detention Basin. Wood/Patel prepared design plans and specifications for this facility, which included three major basins, a system of collection channels, and approximately 2-miles of major storm drains. During the proposal stage, Wood/Patel had suggested 10 refinements from the previously prepared concept design plan from the ADMP. In the final design, Wood/Patel was successful with enhancing the majority of these refinements using creative solutions and value engineering without increasing the previously established project construction budget. The design solutions created were maintenance friendly and enhanced flood control improvements.
Project Highlights
- 2 miles of major storm drains
Location
Mesa, AZ
Client
Flood Control District of Maricopa and City of Mesa