The proposed project included a drainage study to investigate existing drainage conditions on a portion of the ASU Tempe Campus. The project subsequently included installation of an underground regional campus storm water retention system consisting of approximately 2,100 linear feet of 10-foot diameter Corrugated Metal Pipe (CMP). The existing SRC fields were re-sodded, and a portion of the existing sand volleyball courts and irrigation system were removed and replaced.
Project Highlights
- Underground regional campus storm water retention system
Location
Tempe, AZ
Client
Arizona State University