Wood/Patel provided full project construction management and civil engineering inspection services to the Town of Gilbert for the Chandler Heights & Greenfield Road Improvements project. This Construction Manager at Risk (CM@R) project included the complete reconstruction of over three and a half miles of existing roadway along Chandler Heights Road between Rockwell Road and Val Vista Drive, and along Green­field Road between Chandler Heights Road and Queen Creek Road. The improvements include the installation of over one mile of 16” water, one and a half mile of 12” reclaimed water and ¾ mile of 10” sewer, relocation/reconstruction of the ma­jor tee intersection of Chandler Heights and Greenfield Road.

This project also includes the construction of a 1/3 mile long Con-Arch drainage structure, extensive improvements to the RWCD canal crossing and the widening of the existing roadway bridge over the East Maricopa Floodway. The scope of services includes the total overall project management associated with the CM@R delivery method for the project. The Wood/Patel team led the oversight of the design and construction in­volving extensive coordination between utilities, design team, contractor and with the Roosevelt Water Conservation District for this project.

.full-width-592bb48f80b16 { min-height:100px; padding:10px 0 10px; margin-bottom:10px; } #background-layer--592bb48f80b16 { background-position:left top; background-repeat:repeat; ; }

Project Highlights

  • Project Management/Construction Management
  • Civil Engineering Inspection
  • More than 3.5 miles of roadway
#list-style-592bb48f82352 ul li:before { font-family:FontAwesome; content: "\f00c"; color:#aabd55 }

Location

Gilbert, AZ

Client

Town of Gilbert

Related Projects
Contact Us

Thank you for contacting us. We will get back to you within 24 business hours.

Not readable? Change text. captcha txt