Recreational Centers, Sports & Recreation

This site was designed with many of the same attributes as an elementary school site. This included separate baseball and soccer fields, associated bleachers, encouraging way-finding from the park-like setting to the building, and a parking lot with safety drop-off areas. This 6-acre site was a redevelopment of an existing 30-year-old Boys & Girls Club site. Design involved revised drainage conditions associated with driveway reconfigurations. The project delivery method was CMAR and the facility is LEED certified. The site is located within a FEMA floodplain requiring a complex grading design to raise the building above the 100-year flood elevation. Extra precautions were made to keep the facility “child friendly” and ADA accessible.

Project Highlights

  • 6-acre site
  • LEED certified
#list-style-5a2e50d4890d7 ul li:before { font-family:FontAwesome; content: "\f00c"; color:#aabd55 }

Location

Chandler, AZ

Client

Boys & Girls Club Bollinger + Cardenas Architects, Inc.

Related Projects
Contact Us

Thank you for contacting us. We will get back to you within 24 business hours.

Not readable? Change text. captcha txt