Zone 12/13 Water Transmission Mains PDF Print
City of Scottsdale

This project consisted of a 3.0 million gallon reservoir, two booster pump stations, and two miles of 12- and 20-inch pipelines on 114 th Street and Dynamite Road . The 114 th Street pipelines north of Via Dona were designed on dirt roadways with rolling topography and several wash crossings. Wood/Patel is also providing final design services for a transmission main beginning at the Dynamite Road/114 th Street intersection, south to Oberlin, east on Oberlin to 115 th Street, south on 115 th Street to terminate at Four Peaks Road . Other tasks associated with these projects include: aerial mapping, topographic survey, right-or-way determinations, public meetings, drainage study, and geotechnical, archaeological, environmental (owl), and native plant surveys. Assistance at public meetings and working with adjacent developers and other construction projects in the project area for right-of-way dispute resolution is also required. Challenges include several significant wash crossings and numerous rock outcrops.
 


All Content Copyright ©2008 WOOD/PATEL
All Rights Reserved